Preparing for Another 100 Years!

Build Out Board Room, Private Room and Poker on Men’s Locker Room

Golf Course Continued

Add Simulator Above Top of Concession Stand

New Lockers in Men’s Locker Room

New Bathroom Stall in Women’s Locker Room

New Tee Markers

Pumps - 6 Pond to Irrigation Pond

Ballroom

Purchase Spray Hawk

HGT Seed

New Chairs

Remove Old Cart Barns

New Speakers and Sound System

Pump For Water Between Ponds

Build Additional Storage for Chairs and Tables

Improve Cart Paths (1 Green, 17 Green)

Remove Divider at End of Room

New Silverware

Swimming Pool

New Pool Furniture

Dining Venues

New Lounge Chairs at Pool Entrance

New Tables and Chairs in The River Room

New Clock for Swimming Area

Carpet Replacement in River Room

Add 2 Chlorinators to Pool

Carpet Replacement In BR

Add Weir Gates to Skimmers

Add Upper Balcony Above River Room for Dining and Special Events

Replaster Pool (Slinkard)

New Pool Vacuum

Replace 19th Hole Windows

Remodel Both Pool Bathrooms

New Chairs in the 19th Hole

New Entertainment Deck Above Pool Bathrooms

New Barstools in the 19th Hole

New Silverware in the 19th Hole

19th Hole Beer Cooler

Bathrooms & Locker Rooms

Resurface And Stain Veranda Deck Floor

New Bathroom Flooring

New Furniture for the Veranda

New Hallway Flooring

New Gas Fire Pits and Better Fans for the Veranda Additional Seating and Sectionals to the Veranda.

Recover Black Couch in Women’s Bathroom

Replace Paper Towels with Hand Rolled Towels

Made with FlippingBook Annual report maker